14-03-2025

Oeste line

Reopening of the train service

Rail services have been restored on the Oeste line since 2 March 2025.

The reopening of the route between Malveira and Mira Sintra-Meleças, means trains resume normal circulation between Mira Sintra-Meleças and Torres Vedras.

CP Services: Regional and InterRegional

Engineering works on the Oeste line mean Regional trains no. 6414 on 22 March and 6403 on 23 March will run at a different time to usual.

See the train times here.